Monday 30 May 2011

Corrections and details - Part Four


The new drum podium (first one was way too big and not accurate in design) is placed, the "K Rock" back board is cut, pained, logos added and attached to the rear, cabinet trolleys and guide markings are added and front stage speakers are ready to be covered. The crowd floor is added (made from a wood effect floor tile).

No comments:

Post a Comment